Location: Ellensburg
Space Type: Higher Education
Completion Dates: 2018
Manufacturing Partners: KI, ERG
Central Washington University Samuelson Hall
Project Overview
Samuelson Hall was built with the goal of becoming CWU's 5th LEED certified building. It was constructed using materials from older buildings built between 1928 and 1967, including the Samuelson Union Building. Reused and renovated assets include floor slabs, the main concrete frame, and a foundation covering 39,000 square feet. The university needed an interior to match the careful design of the building itself
Workpointe worked alongside CWU Staff Interior Designer to help select not only the best products, but a complete cohesive design throughout the building. Using CWU's official red through out the building helped to achieve that goal.