This project at the University of Idaho was exceptionally challenging. The challenge was to install an architectural demountable wall solution on three levels that looked out onto an atrium. Due to the layout we had to install much of this product while operating off of a boom lift. Demountable wall solutions, much like a dry-wall solution, is very technical and precise and working off of limited floor space was a huge obstacle. The Workpointe team did a phenomenal job in making this project a success.

 
Project Scope

Product:KI Lightline
Year: 2016